Davie Asphalt Experts

Commercial Paving and Parking Lot Resurfacing in Davie

We've been laying and fixing asphalt in Davie for 20 years. South Florida heat and rain wreck parking lots – we rebuild them right.

Get Your Free Estimate

Why Davie Parking Lots Fail Faster

The sun down here is brutal. UV rays oxidize the asphalt binder, turning it brittle and gray. Then summer rains sit on flat lots, seeping into every crack. Freeze-thaw isn't the problem – it's the constant bake-and-soak cycle that breaks down the base. I've pulled up failed lots in Shenandoah where the base rock was practically mud from years of poor drainage.

In areas like Rolling Hills and Davie Ranches, the soil is sandy and doesn't compact well. If the original contractor skimped on base rock thickness or didn't compact it right, you get alligator cracking within a couple years. Water pooling is a dead giveaway the base has failed. We see it all the time at older strip malls off Pine Island Ridge.

Our Resurfacing Process: No Shortcuts

First, we assess the base. If there's base failure, we dig it out, re-compact the subgrade, and bring in fresh base rock. We compact it with a vibratory roller – not a plate tamper. Then we mill the edges of the existing asphalt to create a clean, vertical joint for the new overlay. Tack coat is applied between old and new asphalt to bond them – no tack means delamination in six months.

We lay the new asphalt in lifts. For parking lots, we typically do a 1.5-inch base lift and a 1-inch top course. We use a high-performance asphalt binder that resists the UV down here. After rolling, we sealcoat with a coal-tar emulsion within 30 days to protect the new surface. If there are cracks in the old lot, we rout them out and fill with hot rubber before the overlay – prevents reflective cracking.

Drainage Is Everything in South Florida

You can have the best asphalt mix in the world, but if water sits on it, it's done. We slope every lot to catch basins or sheet flow to swales. In Davie, the water table is high, so we often install French drains or trench drains along the low side. I've seen lots in Pine Island Ridge where the owner spent money on a pretty overlay but didn't fix the ponding – it was cracked again in a year.

We also pay attention to the transitions at curbs and buildings. Water running off the roof can erode the base along the building line. We install concrete curbing or asphalt curbs to direct that water away. For lots with heavy truck traffic, like the ones near the Davie Ranches industrial area, we add a geotextile fabric between the base and subgrade to prevent pumping.

Striping, Signage, and ADA Compliance

A fresh parking lot needs proper striping. We use high-quality traffic paint – not that cheap stuff that fades in three months. We layout stalls, fire lanes, accessible spaces, and loading zones per the latest Florida Building Code. In Davie, the code requires a certain number of van-accessible spaces with 8-foot aisles. We've done dozens of lots in Shenandoah that were out of compliance – we fixed them.

We also install wheel stops, bollards, and signage. If your lot needs speed bumps or speed humps, we can pour those in asphalt or precast concrete. For lots that get heavy use, like church parking lots in Rolling Hills, we recommend adding a second coat of sealcoat every two years to extend the life.

We Work Around Your Business

We know you can't shut down for a week. We stage the work in phases – half the lot at a time. We work nights and weekends if needed. We've done lots for shopping centers on Pine Island Ridge where we had to keep the grocery store entrance open at all times. We use temporary striping and barricades to keep customers safe.

Our crew is local – we live in Davie, Weston, and Pembroke Pines. We answer our own phones. When you call, you get me or my foreman. We don't have a sales team that disappears after the contract is signed. We stand behind our work because we have to drive past your lot every day.

Common Questions About Commercial Paving and Parking Lot Resurfacing in Davie

How long does a commercial asphalt overlay last in Davie's climate?

With proper base prep and a good sealcoat schedule, expect 10-15 years. The sun and rain are hard on asphalt, so sealcoating every 2-3 years is critical. If the base is bad, an overlay might only last 2-3 years – that's why we always check the base first.

Do you handle ADA compliance and striping for parking lots?

Yes. We mark all accessible spaces, crosshatch van-accessible aisles, and install signage per Florida code. We also ensure slopes at curb ramps meet ADA requirements. We can bring your lot up to current standards.

Can you pave a parking lot in phases to keep our business open?

Absolutely. We do phased paving all the time – especially for shopping centers and medical offices. We'll close half the lot, pave it, stripe it, and open it before moving to the other half. Night work is also an option.

What causes alligator cracking and how do you fix it?

Alligator cracking is caused by a failed base – usually from poor drainage or insufficient base rock. We cut out the cracked area, remove the bad base, re-compact the soil, add new base rock, and patch with hot mix asphalt. If it's widespread, a full overlay with base repair is needed.

Do you offer sealcoating and crack filling for existing lots?

Yes. We rout and fill cracks with hot rubber, then apply a coal-tar emulsion sealcoat. We can also add sand to the sealcoat for extra traction in high-traffic areas. We recommend sealcoating every 2-3 years for lots in Davie.

How Much Will Your Davie Project Cost?

Get a real ballpark in 60 seconds — no phone call required.

Other Davie Asphalt Services

Explore our comprehensive paving solutions for your property.